ELECTRICAL SERVICES IN BUILDING CONSTRUCTION
SOFTWARE AVAILABLE :
SOFTWARE AVAILABLE :
- The calculation was based on BS standard tabulation
Automatic generated when input provided
Microsoft Excel Format
Password Protected
The software will provide a result complete with cable sizing to suit.
Applicable for Three (3) phase system 415V and 50Hz system
Overview
- Include the tabulation of the Breaker Size for your individual capacitor Bank
Result will provide you the main breaker for the capacitor bank (inclusive of counter checking result)
The software/tabulation provide the step that can be arrange to suit your system, from 6 steps to 12 steps
Overview
- Applicable for Master AntennaTelevision Only
Overview
SMATV CALCULATION
- Applicable for Master Antenna Television
Applicable for ASTRO (Malaysia) or SAT signal
Overview
Link to Other Calculation
1. Voltage Drop & Cable Sizing
2. Capacitor Bank Calculation 1
3. Capacitor Bank Calculation 2
4. Busduct Voltage Drop
5. Grading Protection Setting
6. Motor MCCB Selection Calculation
7. Street Lighting Voltage Drop
8. MATV Signal Strength Calculation
9. SAT Signal Strength Calculation
No comments:
Post a Comment